Collaborative Information Site

User Profile @ichappsseo

follow: RSS


ichappsseo's Posts

Outside Laboratory For Analytical Testing

To provide a procedure for sending and receiving the samples to outside laboratory for analytical testing. This SOP is applicable to  Quality Control Department. It is the responsibility of  Quality Control personnel to follow this SOP while sending and receiving the samples to outside laboratory for analytical testing. Quality Control Department has to follow the procedure for sending the samples, which are not possible to analyse in the department, to outside laboratory.

https://ichapps.com/qms/view/outside-laboratory-for-analytical-testing

continue reading
1 visits |0 Comments

Operation And Calibration Of WATER BATH CINTEX CIC 2

To provide a procedure to operate and maintain the Cintex make CIC-2 Water Bath. This procedure is applicable for the Cintex make CIC-2 Water bath being used for the analytical purposes in the Quality Control epartment. It is the responsibility of all the personnel involved in the analysis using of the equipment. Check that the instrument and surroundings are clean, if not, clean with a soft cloth duster.

https://ichapps.com/qms/view/operation-and-calibration-of-water-bath-cintex cic-2

continue reading
1 visits |0 Comments

Operation Of Centrifuge Remi R8 C Centrifuge

To provide a written procedure for Re-testing of Raw Materials and Intermediates. This SOP is applicable to all the Raw Materials and Intermediates. It is the Responsibility of Quality Control Dept., stores/ware house, production and Quality Assurance to follow the procedure given in this SOP. For any new product intermediates/Raw materials, data pertaining to shelf life/re-test date has to be provided during the technology transfer. 

https://ichapps.com/qms/view/operation-of-centrifuge-remi-r8-c-centrifuge

continue reading
1 visits |0 Comments

Re Testing Of Raw Materials And Intermediates

To provide a written procedure for Re-testing of Raw Materials and Intermediates. This SOP is applicable to all the Raw Materials and Intermediates. It is the Responsibility of Quality Control Dept., stores/ware house, production and Quality Assurance to follow the procedure given in this SOP. For any new product intermediates/Raw materials, data pertaining to shelf life/re-test date has to be provided during the technology transfer.

https://ichapps.com/qms/view/re-testing-of-raw-materials-and-intermediates

continue reading
1 visits |0 Comments

Operation Of Tapped Density Tester (Campbell Electronics C TDA 2)

The procedure is applicable for calibrating the Campbell make C-TDA-2 tapped density tester used at the Quality Control department. It is the responsibility of the Quality Control personnel involved in the operation of tapped density tester to follow the procedure and schedule as mentioned in this Standard Operating Procedure. Check that the instrument is clean and free from dust, if not, clean with a soft cloth duster.

https://ichapps.com/qms/view/operation-of-tapped-density-tester-campbell-electronics-c-tda-2

continue reading
1 visits |0 Comments

To Provide A Procedure For Operation Of Kipp S Apparatus

To provide a procedure to operate and maintain the Electro pharma make EMS-8 Sieve shaker The procedure is applicable for calibrating the Electro pharma make EMS-8 Sieve shaker used at the Quality Control  It is the responsibility of the Quality Control personnel involved in the operation of  Sieve shaker to follow the procedure as mentioned in this Standard Operating Procedure. 

https://ichapps.com/qms/view/to-provide-a-procedure-for-operation-of-kipp-s-apparatus

continue reading
1 visits |0 Comments

Operation Of Kipps Apparatus

To provide a procedure for operation of Kipp’s Apparatus. This procedure is applicable for the Kipp’s apparatus used in the Quality Control  department  It is the responsibility of the Quality Control personnel involved in the generation of Hydrogen sulfide gas using Kipp’s apparatus to follow the procedure as mentioned in this Standard Operating Procedure.    

https://ichapps.com/qms/view/operation-of-kipps-apparatus

continue reading
1 visits |0 Comments

Operation And Calibration Of PH Meter (Eutech Cyber Scan 1100)

To provide a procedure to operate and maintain the Eutech make Cyberscan 1100 pH meter. The procedure is applicable for calibrating the Eutech make Cyberscan 1100 pH meter used at the Quality Control department. It is the responsibility of the Quality Control personnel involved in the pH meters calibration activity to follow the procedure and schedule as mentioned in this Standard Operating Procedure.

 https://ichapps.com/qms/view/operation-and-calibration-of-ph-meter-eutech-cyber-scan-1100

continue reading
1 visits |0 Comments

Operation And Calibration Of Hot Air Oven For Glass Ware Drying Cintex CIC 212

Before using the Hot air oven, check whether it is calibrated or not.  If not, calibrate it. Switch on the instrument by the “MAINS” switch on the control panel of the instrument. The control panel consists of  Microprocessor based Temperature controller, Three heat control switch (Rotatory switch) to control heating rate control, ON/OFF switch for FAN.

https://ichapps.com/qms/view/operation-and-calibration-of-hot-air-oven-for-glass-ware-drying-cintex-cic-212

continue reading
1 visits |0 Comments

Operation of reverse laminar flow unit

Reverse laminar air flow unit works with the principle   of reverse laminar flow, which is helpful to control the material exposure. Before starting the work  on reverse laminar flow ,switch on blow and observe pressure  obtaining  from magnahelic gauge. The pressure when the instrument is in operating condition should be between 5 to 15 PSIG. For any composite sample preparation of raw   materials, intermediates and finished product,should be Operate under the air flow only.

https://ichapps.com/qms/view/operation-of-reverse-laminar-flow-unit

continue reading
1 visits |0 Comments
[]